FOS216-BEDC-007 · Arrival Gateway · Issued 2026-09-12

AXIS 057.81

The last 1,200 ft of the arrival, across the only ground on the route where nothing is permitted to rise at all.

Two works on one bearing. THE CUT, a 1,200-ft walled processional on the campus side, entirely below grade. THE LINE, a 42-ft blade pair and a 1,000-ft inlaid strip on the public greenway — the tallest legal object on this half of the site, standing on public ground rather than behind the fence.

Both run 057.81° true. Twice a year the sun runs down both of them at once.

REV. C — EN-4 and the section drawings corrected: THE CUT is an OPEN TRENCH, roofless for its full 1,200 ft, running BESIDE the runway at V=207 and never under it. Rev. B drew the Part 77 plane straight across the opening, which read as a roof. — The entrance is at the EAST end, off North Marginal Road. The cut is movement III of three, not the whole entrance. See FOS216-BEDC-010 for the gate and the corrected envelope.
ProjectBurke Energy & Data Campus
SheetBEDC-007 · Rev. C
Scale10 drawings, EN-1 to EN-10
Date2026-09-12
Proposed — illustrative only. Not an existing facility. No site control.
The FixOurStreets216 Project
Neighborhoods First · #WeThePeople
01The finding that shapes everything

The last 1,200 ft of the road is zero-height

The 14 CFR Part 77 primary surface is 1,000 ft wide, centered on runway 6L/24R, and carries zero allowable height. The campus road runs at V=207 — 293 ft inside that line — from U=4,600 to U=5,173, where the primary surface ends, 200 ft past the runway end.

Over that stretch height is earned sideways only: 1 ft for every 7 ft you step lakeward of V=500, capped at 150 ft. That is what shapes the cut and what puts the one permitted vertical on the public greenway.

REV. B CORRECTION — Rev. A said this zero-height condition ran from U=4,600 to U=7,973 and that driving the gate east bought nothing. Both were wrong: the airspace model ran the primary surface east past its actual end. Beyond U=5,173 the approach surface governs and height climbs at 50:1 — 26.5 ft at U=6,500, 46.5 ft at U=7,500. The full correction and its errata are in FOS216-BEDC-010 §01 and §07.
0.0 ft
On the road, U=4,600 to U=5,173
14.3 ft
At V=600
28.6 ft
At V=700
43.1 ft
At V=802, the public greenway

So a monument anywhere on this stretch is not discouraged — it is an obstruction at any height above grade. The design follows from that, and it turns out to be the better building: grandeur by subtraction on the campus side, and the one permitted vertical given to the public. The gate itself sits 2,140 ft further east, where height is available; that is BEDC-010.

EN-1 · Part 77 Height Envelope - Both Cases

CASE B - 200 FT, 14 CFR 77.9 NOTICE THRESHOLDairport closed: no Part 77 surface existsPRIMARY SURFACEZERO ALLOWABLE HEIGHT1,000 ft wide, centered on 6L/24RTRANSITIONAL SURFACE 7:11 ft of height per 7 ft lakeward of V=500HORIZONTAL SURFACE CAP 150 FT2070.0 ftROAD CENTERLINE2450.0 ft4100.0 ft5000.0 ftEDGE OF PRIMARY77639.4 ft80243.1 ftPUBLIC GREENWAY85050.0 ft115092.9 ftTHE LINE42 ft blade, 1.1 ft of marginTHE CUT -12 FTHEIGHT ABOVE GRADEgrade el. 583.0 IGLD85050100150200500 FT (horizontal)

lateral section WEST of U=5,173; V in ft from centerline; heights at 2x

The restriction is a ramp, not a ceiling - west of where the primary surface ends.

02The proposition

Two works, one bearing

THE CUT · campus side

1,200 ft from the gate west. The road descends 12 ft over a 240-ft ramp, runs 720 ft flat between walls 90 ft apart, and climbs back out. Nothing rises above grade. From the runway, from the air, and from the lake there is nothing to see but a seam in the ground.

The north wall carries the fin field. The south wall is board-formed concrete cast with Cuyahoga Valley steel slag — the mills' waste as the wall of the thing that replaces them.

THE LINE · public side

A 42-ft blade pair on the greenway at V=802, 40 ft clear between them, and a 4-in polished stainless strip inlaid flush in the path running 1,000 ft east on 057.81°.

The blades' inner faces carry the same fin system as THE CUT, driven by the same signal. The public reads the same live campus load the staff do. Nothing is hidden from the city that is shown to the operator.

The security line was already moved inboard on BEDC-005 so the shoreline greenway stays outside the fence. THE LINE depends on that decision: it only works as a public work if the public can walk it.

03The Cut · plan

The last movement of three

You cleared the gate 3,340 ft ago at the east end of the site and drove the gradient and the traverse to get here. The cut is where the arrival lands. It sits inside the fence, which is exactly why the public piece has to exist separately rather than being a view of the private one.

EN-2 · Arrival Sequence - Plan

LAKE ERIE SHORELINEEDGE OF PRIMARY SURFACE V=500 - zero height south of this lineTHE FIN WALL 720 FT - 36 BAYS x 10 ROWSnewest data at the west end: you drive forward through the last 24 hoursTHE APERTUREsouth wall drops to grade - 120 ftrunway at eye levelGATEat grade, frangibleTHE LINE42 ft blade pair, 40 ft clear - 1,000 ft inlaid stainless strip on 057.81public greenway stays outside the fenceSECURITY LINE V=850JUN 21 SUNRISE AZ 059.01,200 FT - 240 RAMP / 720 FLAT / 240 RAMPN500 FT

1 in = 150 ft at 1110 px

You clear the gate, then descend. The ceremony is inside the fence; the public piece is not.

04The Cut · longitudinal section

Twelve feet down, and the horizon disappears

At a 60-ft carriageway and a 12-ft wall the enclosure ratio is 1:5 — enough to feel held, not enough to feel trapped. Ramps at 5% keep the route usable by everything except heavy haul, which takes a separate at-grade route on the north side. You do not want a 400-ton generator step-up transformer coming down your front door.

1,200 ft
Total length, 240 ramp / 720 flat / 240 ramp
12 ft
Depth below existing grade el. 583.0
−0.4 ft
Invert relative to lake low water datum
1:5
Enclosure ratio

The cost that has to be stated up front: the invert lands at el. 571.0, which is 0.4 ft below Lake Erie low water datum and roughly 3 ft below mean. On hydraulic fill over dredge material that means a tanked structural slab, a perimeter sump and permanent pumping. This is the single largest line item in the arrival works and it should be priced before the idea is adopted, not after.

EN-3 · The Cut - Longitudinal Section

HYDRAULIC FILL OVER DREDGE MATERIALLAKE ERIE LOW WATER DATUM EL. 571.4mean 573.9TANKED STRUCTURAL SLAB + PERIMETER SUMP - invert 0.4 ft below LWDFIN FIELD 10 FTRAMP 5%240 FTRAMP 5%240 FTEXISTING GRADE EL. 583.0PART 77 PRIMARY SURFACE - NOTHING MAY RISE ABOVE THIS LINE12 FT1,200 FTSECTION ON THE ROAD CENTERLINE V=207

horizontal 1:1 with plan, vertical 10x

Grandeur by subtraction. The invert sits 0.4 ft below lake datum, so the slab is tanked.

05The Cut · cross section

A double wall, because 360 drives have to be reachable

The north wall is built twice with a 4-ft service gallery between. Every actuator is reached from behind, dry, without closing the road or touching the fin face. A kinetic facade that can only be serviced from a lift over a live carriageway will be switched off within two years.

EN-4 · The Cut - Cross Section at the Fin Wall

60 FT CARRIAGEWAYtwo lanes + 15 ft walk each sideBOARD-FORMED CONCRETECUYAHOGA SLAG AGGREGATESERVICE GALLERY 4 FTFIN FIELD 10 ROWS x 10 FTRECESSED AMBER GRAZER 2200Kzero uplight guaranteed by geometry, not opticsPART 77 PRIMARY SURFACE - ZERO HEIGHTan imaginary plane, not a structureOPEN TO SKY - NO ROOF, NO DECK, NO COVERyou can see straight up out of it the whole wayLWD 571.412 FT90 FT WALL TO WALL

vertical 2x

A double wall. The service gallery is why 360 drives are maintainable.

06The Fin Wall

720 feet of the last 24 hours

Thirty-six bays, ten rows. Each bay is 40 minutes. The number of rows turned to the bright face is the campus IT load in ten steps from zero to 1,000 MW. Newest data sits at the west end, so driving inbound you move forward through the day and arrive at now as the halls come into view.

It emits no light by day. The wall reads as tone, not motion — anodized bronze turned against anodized graphite. That is the whole airport-safe argument, and it is why this is a mechanical piece rather than a screen.

EN-5 · The Fin Wall - Elevation and Data Mapping

BAY 36 - NOWBAY 1 - 24 HOURS AGO720 FT / 36 BAYS / 40 MINUTES PER BAYinbound travel is west, so you drive forward through the day and arrive at "now"DIRECTION OF TRAVELBAY 34739 MWBAY 35729 MWBAY 36726 MWENLARGEMENT - THREE BAYS20 blades per bay row, 12 in blade on a 12 in pitch20 FT BAYWHAT THE WALL IS SAYINGROW COUNTcampus IT load, 0-1,000 MW in 10 stepsBAY POSITIONtime, 40 minutes per bay, newest westBRIGHT FACEbronze anodize, 20 deg from wall planeDARK FACEgraphite anodize, blade turned flatPARTIAL ROWfractional load, blade held mid-angleNO LIGHT IS EMITTED BY DAY.The wall reads as tone, not motion - which isthe whole airport-safe argument.360 DRIVES, NOT 7,200.Blades ride a common shaft per bay row. Onebrushless rotary with absolute encoder per bayrow, IP66, served from the gallery behind.LOAD CURVE SHOWN IS INDICATIVEFinal mapping to be set with operations once thefirst hall is commissioned and real load data exists.

full length 1:900, enlargement 1:120

The wall is a 720 ft analog graph of the last 24 hours of campus load.

07Fin module

7,200 blades on 360 drives

Twenty blades ride a common shaft per bay row. One brushless rotary with an absolute encoder turns each shaft. Torque-limited, captive pins, nothing that can leave the wall — and the cut itself shelters the whole field from wind, which is the reason a kinetic facade is defensible this close to a runway at all.

EN-6 · Fin Module - Detail

FLAT - DARK0 degMID - PARTIAL55 degTURNED - BRIGHT90 degBLADE ROTATIONSECTION THROUGH ONE BAY ROWSERVICEGALLERYBRUSHLESS ROTARY DRIVEabsolute encoder, IP66, one per bay rowCONTINUOUS SHAFT20 blades captive on one shaftBLADE 12 x 12 INanodized aluminum - bronze face,graphite reverse, no paint, no coatingTORQUE LIMITER + CAPTIVE PINFOD control: no component can leave the wallCOUNT36 bays x 10 rows360 drives20 blades per bay row7,200 bladesbay length20 ftblade pitch12 infield height10 ft on a 12 ft wall

1 in = 8 in

Captive, torque-limited, inside the cut. Nothing can leave the wall.

08The Line

The only legal vertical stands on public ground

At V=802 the envelope is 43.1 ft. The blades are drawn at 42, which leaves 1.1 ft of margin — thin, and it should be confirmed by survey before any foundation is poured, because the envelope is measured from the runway centerline and the centerline position is the one dimension on this site we took from published geometry rather than from the ground.

EN-7 · The Line - Public Greenway Plan

LAKE ERIE010020030040050060070080090010004 IN POLISHED STAINLESS STRIP, FLUSH - 1,000 FT ON BEARING 057.81 TRUE42 FT42 FT40 FT CLEARTHE BLADESinner faces carry the same fin system as THE CUTthe public reads the same live load the staff doJUN 21 SUNRISEAZ 059.0 - 1.19 deg off axisDEC 21 SUNSET AZ 236.3envelope at V=740 is 34.3 ft - blades held at V=802 where it is 43.1 ftSECURITY FENCE AT V=654 - 148 FT SOUTH OF THE PATH, greenway stays publicN300 FT

1 in = 120 ft

The only legal vertical on the west half of this site stands on public ground.

09Solstice geometry

Not designed. Found.

Runway 6L/24R was laid out in 1947 on a bearing of 057.81° true. The June 21 sunrise over Lake Erie at this latitude bears 059.0°, and the December 21 sunset bears 236.3° against a reciprocal of 237.81°. Those are misses of 1.19° and 1.51° — about two and three sun diameters.

Close enough to read as alignment standing on the path. Not close enough to call it an alignment in a document, which is why it is stated here as a near miss with the numbers attached. The campus inherits it for free; it did not earn it.

EN-8 · Solstice Geometry

000045090135180225270315CAMPUS AXIS 057.81 TRUERECIPROCAL 237.81NTHE TWO EVENTSJUN 21 SUNRISE06:05 EDTalt 1.1 az 059.0+1.19 deg off axisDEC 21 SUNSET16:45 ESTalt 1.5 az 236.3-1.51 deg off reciprocalThe sun disk is 0.53 deg across.These misses are 2.2 and 2.8 disks -close enough to read as alignmentfrom the ground, and honest enoughto state as a near miss, not a claim.NOT DESIGNED. FOUND.Runway 6L/24R was laid out in 1947.The alignment is an accident ofCleveland geography that the campusinherits for free.

not to scale

The axis was set by a runway in 1947. It happens to point at the solstice sun.

10Case A and Case B

The zero-height scheme is the permanent core

Case B — airport closed — removes the Part 77 surfaces entirely, and the campus drawn in BEDC-002 already assumes it. So strictly the entrance has no height limit. The scheme is still designed to zero, for a reason that is strategic rather than regulatory.

Closure is the one thing in this file outside your control: the FAA is on record opposed, grant obligations run to at least 2039, and the east lobe is an active federal dredge cell. A zero-height entrance is the only part of this campus buildable under either outcome — which also makes it the only part you could put on the ground now, years ahead of any closure fight, as a public lakefront amenity that asks the city for nothing.

If closure does come, the axis gains a 180-ft mast at the gate and the blades grow to 90 ft. The mast is held below 200 ft deliberately: that is the 14 CFR 77.9 notice threshold, and staying under it means no obstruction lighting on a lakefront that does not need a blinking red beacon.

EN-9 · Case A and Case B Compared

GRADECASE A - AIRPORT OPERATINGbuildable today, no closure requiredCASE B - AIRPORT CLOSEDPart 77 surfaces cease to existTHE CUT -12 FTTHE BLADES 42 FTENVELOPE AT V=802: 43.1 FTENVELOPE ON THE ROAD: ZEROTHE CUT - UNCHANGEDBLADES 90 FTTHE MAST180 FT200 FT - 14 CFR 77.9 NOTICE THRESHOLDmast held at 180 ft: no FAA notice, no obstruction lighting120 FT HALL120 FT HALL050100150200

vertical 1 in = 30 ft

The zero-height scheme is the permanent core, not a compromise waiting to be replaced.

11FAA constraints schedule

Height is the one everybody checks. It is not the one that kills projects.

Nine constraints govern an object this close to an active runway end. Height is the first and the most visible. Wildlife attractants and hazardous lighting are the two that most often stop a design that already cleared the height test.

ConstraintGovernsHow this scheme answers it
HEIGHT14 CFR 77.19Zero on the road for its full length; 43.1 ft at V=802. Base scheme complies. Blades at 42 ft carry 1.1 ft of margin — confirm by survey before foundations.
LIGHTINGAC 70/7460-1, AC 150/5300-13Amber 2200K only. Red, green, blue and white are aviation signal colors and cannot appear in any array near a runway end that could read as a light pattern. Grazers recessed below the top of wall, so zero uplight is guaranteed by geometry rather than by fixture optics. Photometric submittal and airspace review required.
GLAREFAA solar glare analysisAnodized and diffuse finishes only. No polished or mirror surface faces the 24R approach. The inlaid stainless strip is horizontal at V=802 and 800 ft off centerline — flag it for a glare check anyway. Any photovoltaic array triggers a full analysis.
WILDLIFEAC 150/5200-33BNo open water, no standing water beyond 48 hours, no fruit- or seed-bearing planting within 10,000 ft of the runway. This is what rules out the reflecting pool every arrival court wants. Greenway planting to a bird-hazard-screened list; the tanked slab drains to a covered sump.
FRANGIBILITY14 CFR 77.17, runway OFAThe perimeter fence runs V=170 across the compute row, which puts it inside the primary surface. At 8 ft it is an acknowledged obstruction — as is every fence at Burke today. Gate house at grade and frangible; terrace guard frangible; fence jogs to V=150 around the aperture terrace.
CONSTRUCTIONForm 7460-1, separate filingThe crane is the tallest object this project will ever have. Separate notice, night and weekend work windows, and a crane plan agreed with the tower before mobilization.
NAVAID / RADARShadow studyThe fin wall sits 12 ft below grade with no line of sight to the ASR or any NAVAID. The Case B mast requires a shadow study and its own 7460-1.
FODPart 139 airfield conditionEvery kinetic component captive and torque-limited. No loose fasteners within the runway object free area. The cut shelters the fin field from wind, which is what makes the moving parts defensible here.
THERMALPlume and turbulenceNo plume from any part of the arrival works. Generation is air-cooled, the lake loop is closed, and nothing in the gateway rejects heat.
12Materials

Three materials, no coatings

ElementMaterialWhy
South wallBoard-formed concrete, Cuyahoga Valley steel slag aggregate, sandblastedA Cleveland material with a Cleveland argument in it. Sandblasting exposes the slag rather than describing it.
Fin bladesAnodized aluminum — bronze face, graphite reverseAnodize is integral, not applied: no repainting 7,200 moving parts, and diffuse by nature, which answers the glare question.
Blades, greenwaySame anodize over a steel armatureOne material language across the private and public halves.
The line316 stainless, 4 in wide, mill polish, flushFlush so it is a surface, not a trip hazard; 316 for a lakefront freeze-thaw path.
Not usedWeathering steelIt stains everything downslope of it, and everything downslope here is a public path.

No tenant, utility or partner mark appears on any surface of either work. That rule already governs the rendering set and it governs the built work too.

13What the projector caught

Five errors the plans did not show

Every view in BEDC-008 is a true pinhole projection of this geometry, not an illustration. That is worth the trouble because it fails loudly when the design is wrong.

CaughtWhat happened
The aperture did not workIt was first drawn as a ha-ha — ground sloping up out of the cut. From eye 5 ft 6 in on a floor 12 ft down, the slope crests above the sight line at 5.2° against a 2.1° view angle, and hides the runway it exists to reveal. AR-4 came back empty. Redrawn as a terrace at grade reached by ten treads.
A fence post in the shotThe standard perimeter runs V=170 across the compute row, which put an 8-ft post 12 ft in front of the aperture camera, and posts land every 45 ft from U=4,470 — one of them exactly at U=4,560. The fence jogs to V=150 around the terrace and the camera moved to U=4,537.
A lens that could not hold its subjectAR-5 at 28 mm could not fit hall 4's 120-ft parapet from 230 ft. Corrected to 20 mm and the camera swung 60 ft north off the wall.
An impossible cameraAR-8's first position put the heat-exchange plant's north face within a few feet of the lens, which blanketed the frame and hid the mast entirely. Camera relocated west of the plant.
The runway was never modeledNo earlier view in this set looked south off the property, so 6L/24R had never been drawn. AR-4 does, and needed it built.
14View key

Eight stations

Six in Case A, two showing the Case B variant. Every camera verified inside the property line and every lens verified to hold its subject. Full views in FOS216-BEDC-008; photorealistic prompts keyed to them in FOS216-BEDC-009.

EN-10 · View Key - AR-1 through AR-8

135 mm228 mm324 mm435 mm520 mm635 mm735 mm835 mmN500 FTYELLOW = CASE A TEAL = CASE B

1 in = 200 ft

Camera stations for the perspective set. Every one verified inside the property line.

Closing

What this fixes

BEDC-005 ended by naming a real gap: 2,600 ft of empty road to a gate, with no address and no forecourt. A council member or a tenant notices that in the first thirty seconds. This sheet answers it without asking the FAA for anything, and it does so by taking the one thing the airspace actually permits — a 43-ft vertical on public ground — and giving it to the public rather than to the front gate.

Open items: price the tanked slab before adopting the cut; survey the runway centerline before committing to 42 ft on the greenway; and agree the fin wall data mapping with operations once the first hall is commissioned and real load exists.

Read with FOS216-BEDC-010, which carries the east gate, the gradient, the corrected airspace model and the errata this revision depends on.

ProjectBurke Energy & Data Campus
SheetBEDC-007 · Rev. C
Scale10 drawings
Date2026-09-12
Proposed — illustrative only. Not an existing facility. No site control.